Firefox OS/DeviceQA/2014-10-06WeeklyReport: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
(Created page with " Last week | Next week {| class="wikitable" class="fullwidth-table" border="1"...")
 
No edit summary
Line 9: Line 9:
| Al
| Al
||
||
* Week W40 (09/29~10/03):
* Week W41 (10/06~10/10):
** Bug 1074612 getUserMedia issues solving
*** New Testing github Repo at mozilla-b2g
*** Generate testing cases in excel format to partners
** Kick off drafting on FC/CC criteria checking list
||
||
* Week W41 (10/06~10/10):
|-
|-
| Walter
| Walter
||
* Week W40 (09/29~10/03):
** Bug solving for mtbf
** MTBF test runs*3
** review pull requests
||
||
* Week W41 (10/06~10/10):
* Week W41 (10/06~10/10):
Line 29: Line 19:
** combo runner
** combo runner
** db for phone and data
** db for phone and data
||
|-
|-
| Cynthia
| Cynthia
||
||
* Week W40 (09/29~10/03):
* Week W41 (10/06~10/10):
**Take care of Flame KK v2.0 automation reports  
**Take care of Flame KK v2.0 automation reports  
***Bug 1077377 - [v2.0] Investigate test_camera_flash_modes failure
***Bug 1077367 - [v2.0] Investigate test_camera_capture_video failure
**Clarify and reproduce Woodduck issues
**Clarify and reproduce Woodduck issues
||
||
* Week W41 (10/06~10/10):
**Take care of Flame KK v2.0 automation reports
**Clarify and reproduce Woodduck issues
|-
|-
| Edward
| Edward
||
* Week W40 (09/29~10/03):
** Smoketest for v2.1 productivity apps with KK build
** B2g perf for productivity of v2.1
** Rewrite test cases of WebRTC and RTSP
** [Media Platform] Test cases modification - getUserMedia
** [Prod] Test/ verify sprint 5 tickets
** 2.1 Feature sharing
||
||
* Week W41 (10/06~10/10):
* Week W41 (10/06~10/10):
** [Prod] Test/ verify sprint 6 tickets  
** [Prod] Test/ verify sprint 6 tickets  
** Smoketest for v2.1 productivity 3rd run
** Smoketest for v2.1 productivity 3rd run
||
|-
|-
|Shing
|Shing
|
*Week W40 (09/29~10/03)
** Cost Control test cases design.
** Read ''Pragmatic Software Testing''.
** Prepare sharing on how to submit app to Firefox Marketplace.
** Cost control 2.1 blockers triage with Marshall (RD).
||
||
*Week W41 (10/6~10/9)
*Week W41 (10/6~10/9)
Line 69: Line 42:
** Read ''Pragmatic Software Testing''
** Read ''Pragmatic Software Testing''
** Sharing on how to submit app to Firefox Marketplace
** Sharing on how to submit app to Firefox Marketplace
 
||
|-
|-
|Askeing
|Askeing
|
* Week W40 (09/29~10/03)
** Investigate the MCTS.
** Develop the flashing tools for MTBF.
** Prepare the information of outsourcing.
** Follow up the Card UI user story.
||
||
* Week W41 (10/6~10/9)
* Week W41 (10/6~10/9)
Line 84: Line 51:
** Prepare the information of outsourcing.
** Prepare the information of outsourcing.
** Follow up the Card UI user story.
** Follow up the Card UI user story.
||
|-
|-
|Gerry
|Gerry
|
*Week W40 (09/29~10/03)
** Smoketest for v2.1 system platform with KK build.
** App usage metric test cases design.
** 2.1 system platform feature sharing.
** Verify 2.1 bugs.
||
||
*Week W41 (10/6~10/9)
*Week W41 (10/6~10/9)
Line 97: Line 59:
** Finish app usage metric test cases.
** Finish app usage metric test cases.
** Verify bugs.
** Verify bugs.
||
|-
|-
| Mike
| Mike
||
* Week W40 (09/29~10/03):
**Flame base image verification: v184
**Madai bug verification
**Extend Orangutan capability
**3rd party app performance measurement
||
||
* Week W41 (10/6~10/9)
* Week W41 (10/6~10/9)
Line 111: Line 68:
**Device Team Entry Criteria discussion
**Device Team Entry Criteria discussion
**Arrange discussion of topics against MozTrap Ecosystem
**Arrange discussion of topics against MozTrap Ecosystem
||
|-
|-
| Paul
| Paul
||
* Setup device for flame_kk
* Workaround for v2.0 software home button
* Fix test case error
* Patch for reusing marionette instance
* Trigger custom build run for patch 1064800
||
||
* Trigger test run
* Trigger test run
Line 128: Line 80:
* Bug fix for in-testcase logging
* Bug fix for in-testcase logging
* Modify crash report patch based on review  
* Modify crash report patch based on review  
||
|-
|-
| eric
| eric
||
* Week W40 (09/29~10/03):
** Exploratoy against v2.1
** Feature page index for OS
** Verification of bugs before FC
** Reviewing smoke test case
||
||
* Week W41 (10/06~10/09):
* Week W41 (10/06~10/09):
Line 144: Line 91:
** Reviewing smoke test case
** Reviewing smoke test case
** Market customization testing
** Market customization testing
||
|-
|-
| Hubert
| Hubert
||
||
* Week W40 (09/29~10/03):
* Week W41 (10/06~10/09):
** Woodduck weekly meeting  
** Woodduck weekly meeting  
** Follow up Woodduck tasks and issues
** Follow up Woodduck tasks and issues
Line 154: Line 102:
** Outsourcing meeting with EPM
** Outsourcing meeting with EPM
||
||
* Week W41 (10/06~10/09):
** Woodduck weekly meeting
** Follow up Woodduck tasks and issues
** Plan outsourcing training items (Document, account...etc)
** Woodduck triage meeting
** Outsourcing meeting with EPM
|-
|-
| William Hsu
| William Hsu
||
* '''Week W40 (09/29~10/03)'''
** [Device] Assist device related tests - Tako
*** Prepare All-in-one test machine/VM for partner (Part II: System Configuration 9/29~9/30)
*** Assign Tako's bugs to developers and stakeholders.
*** Weekly meeting with partner (9/30)
***# Three-way synchronization (project status)
** [Device] Assist device related tests - Flame
**# Gaia UI test on v2.0 Build
**# v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn)
** Others,
*** Q3 personal performance review
||
||
* '''Week W41 (10/06~10/10)'''
* '''Week W41 (10/06~10/10)'''
Line 186: Line 116:
** Others,
** Others,
*** National holiday 10/10
*** National holiday 10/10
||
|-
|-
| Alison
| Alison
||
* Week W40 (09/29~10/03):
** Reviewing smoke test case
** Bugs verification
||
||
* Week W41 (10/06~10/09):
* Week W41 (10/06~10/09):
** Smoketest for bluetooth v2.1  
** Smoketest for bluetooth v2.1  
** Bugs verification
** Bugs verification
||
|-

Revision as of 05:50, 13 October 2014

Last week | Next week

Name Done Plan
Al
  • Week W41 (10/06~10/10):
Walter
  • Week W41 (10/06~10/10):
    • Bug solving for mtbf
    • test cases experiments
    • combo runner
    • db for phone and data
Cynthia
  • Week W41 (10/06~10/10):
    • Take care of Flame KK v2.0 automation reports
    • Clarify and reproduce Woodduck issues
Edward
  • Week W41 (10/06~10/10):
    • [Prod] Test/ verify sprint 6 tickets
    • Smoketest for v2.1 productivity 3rd run
Shing
  • Week W41 (10/6~10/9)
    • Cost Control test cases cleanup.
    • Apps usage metrics test cases design.
    • Read Pragmatic Software Testing
    • Sharing on how to submit app to Firefox Marketplace
Askeing
  • Week W41 (10/6~10/9)
    • Investigate the MCTS.
    • Develop the flashing tools for MTBF.
    • Prepare the information of outsourcing.
    • Follow up the Card UI user story.
Gerry
  • Week W41 (10/6~10/9)
    • Smoketest for v2.1 system platform with KK build.
    • Finish app usage metric test cases.
    • Verify bugs.
Mike
  • Week W41 (10/6~10/9)
    • 3rd party app performance measurement
    • Madai bug verification
    • Device Team Entry Criteria discussion
    • Arrange discussion of topics against MozTrap Ecosystem
Paul
  • Trigger test run
  • Fix device test issue for mtbf on tako
  • day off - 10/8 - 10/9 in Okinawa

-- backlog --

  • Followup live test run stream
  • Datazilla integration
  • Bug fix for in-testcase logging
  • Modify crash report patch based on review
eric
  • Week W41 (10/06~10/09):
    • Exploratoy against v2.1
    • Feature page index for OS
    • Verification of bugs before FC
    • Fixing SMS/STK test cases
    • Reviewing smoke test case
    • Market customization testing
Hubert
  • Week W41 (10/06~10/09):
    • Woodduck weekly meeting
    • Follow up Woodduck tasks and issues
    • Plan outsourcing training items (Document, account...etc)
    • Woodduck triage meeting
    • Outsourcing meeting with EPM
William Hsu
  • Week W41 (10/06~10/10)
    • [Device] Assist device related tests - Tako
      • Assign Tako's bugs to developers and stakeholders.
      • Executing Gaia UI test on Tako ES2 build (ETA: 10/07)
      • Executing smoketest on Tako ES2 build (ETA: 10/09)
      • Weekly meeting with partner (10/07)
    • [Device] Assist device related tests - Flame
      1. Gaia UI test on v2.0 Build
      2. v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn)
    • Others,
      • National holiday 10/10
Alison
  • Week W41 (10/06~10/09):
    • Smoketest for bluetooth v2.1
    • Bugs verification