Marigold: Difference between revisions
Jump to navigation
Jump to search
(template) |
Joshwalker (talk | contribs) |
||
Line 2: | Line 2: | ||
=='''Program Description'''== | =='''Program Description'''== | ||
Marigold is the outsourced QA vendor for Mozilla. They are helping Bugwork, Smoke test, l10n, RTL, power consumption... | |||
===Product Requirements:=== | ===Product Requirements:=== | ||
Enter text here | Enter text here | ||
=='''Program Status'''== | =='''Program Status'''== |
Revision as of 11:31, 15 October 2015
Program Description
Marigold is the outsourced QA vendor for Mozilla. They are helping Bugwork, Smoke test, l10n, RTL, power consumption...
Product Requirements:
Enter text here
Program Status
Milestone | Date | Status |
---|---|---|
Milestone 1 | ON TARGET | |
Milestone 2 | CHALLENGED | |
Milestone 3 | AT RISK |
Status Key
Color | Status | Key |
---|---|---|
On Target | The project or deliverable is expected to meet its due date. | |
Challenged | The project or deliverable is facing an issue that might cause it to miss its due date, but a “get well” plan has been developed to get it back on track. | |
At Risk or Late | The project or deliverable is blocked or facing an issue that might cause it to miss its due date, and there’s no “get well” plan to get it back on track, or it is already late. | |
Done | The project or deliverable has been completed. | |
On Hold | The project or deliverable has been placed on hold. |
Program Timeline
MVP Scope
Querying by 2.6+ features
(please add correct bug tracking number)
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
Dependency Tracking
Detailed Program Plan
Action Item | Engineering Owner | QA Owner | UX Owner | Bugzilla ID | Planned Done | Actual Done |
---|---|---|---|---|---|---|
Program Stakeholders
Role | Name | IRC |
---|---|---|
EPM | ||
EM | ||
PM | ||
TL | ||
UX | ||
QA |
- EPM = Engineering Program Manager
- EM = Engineering Manager
- PM = Product Manager
- TL = Tech Lead
- UX = User Experience
- QA = Quality Assurance