Connected Devices Weekly Update/2016-04-26: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
(added Magnet update)
(added link for B2G OS transition working groups)
 
(20 intermediate revisions by 9 users not shown)
Line 10: Line 10:
! style="background:#00EC00;" | On Target
! style="background:#00EC00;" | On Target
|  
|  
* Bulleted list item
* Product
* Bulleted list item
** Work week in Portland last week
** Choosing Hypothesis to test and priorities
** Working with User Research to find the best ways to test the Hypothesis
* Engineering
** Reviewing Feedback from the Berlin event
** Getting ready to Demo to the exec team tomorrow (come check it out)
** Working on Pocketsphinx STT Implementation
** Will be able to use the offline implementation by the end of this sprint
** Working on Voice recording and synthesis
** Ongoing Architecture discussions. How we can achieve skills or Services through Vaani
*General
**You can see the sprint items on [https://trello.com/b/r0I5VOL3/vaani-overall-project Trello]
**You can see the weekly meeting notes [https://docs.google.com/document/d/1_qjWDdkw_xKTQ2xWILU6S17VTAUgbPp_jaLuSMpGBK4/edit here]
**Next Demo will be 4/27 it is on the CD calendar
 
|-
|-
| [https://wiki.mozilla.org/Project_Link Project Link]
| [https://wiki.mozilla.org/Project_Link Project Link]
Line 17: Line 31:
! style="background:#00EC00;" | On Target
! style="background:#00EC00;" | On Target
|  
|  
Project
Product and Research
*  
* Continued brainstorming on product differentiators
*  
* Working on user segment research and user interviews to gather user pain-points
UX
* Continuing the evaluation of voice integration options and other possible collaborations
*
* Held discussions for next phase targets, will meet again Thursday to finalize direction
*  
*  
Engineering
Engineering
*  
* Working on video of first phase demo that shows open/close window sensor, hue lights, and door locks integrated into fox box and working end to end, along with notifications enabled via Web push.
*  
* Ensuring consistent performance
*  
* Designing and developing a demo/showcase room for Link devices. Separate VLAN is ready in one of the conference rooms and devices are purchased as well. Ready to be mounted. Hope to use this for the London All Hands video
Participation
Participation
*  
* Will discuss and prioritize how volunteer contributors can help at London All Hands after next steps are agreed upon
|-
|-
| [[Firefox_OS/Smart_TV|Smart TV for 2.6]]
| [[Firefox_OS/Smart_TV|Smart TV for 2.6]]
Line 36: Line 47:
! style="background:#00EC00;" | On Target
! style="background:#00EC00;" | On Target
|  
|  
* Bulleted list item
* 4/25 branch - technical issue, should be ready 4/27
* Bulleted list item
* 7/15 FC
* 9/1 CC
|-
|-
| Smart TV Next Gen
| Smart TV Next Gen
Line 43: Line 55:
! style="background:#00EC00;" | On Target
! style="background:#00EC00;" | On Target
|  
|  
* Bulleted list item
* Web Apps descoped due to Marketplace team resource issue.
* Bulleted list item
|-
|-
| [[Connected_Devices/Projects/Smart_Home|Project SmartHome]]
| [[Connected_Devices/Projects/Smart_Home|Project SmartHome]]
Line 50: Line 61:
! style="background:#00EC00;" | On Target
! style="background:#00EC00;" | On Target
|  
|  
* '''We did:''' Met in Portland with CD PM and UX teams.
'''We did/learned:''' Met in Portland with CD PM and UX teams. Our hypothesis was still pretty broad. So we narrowed and refined it.  
* '''We learned:''' Our hypothesis was still pretty broad. So we narrowed and refined it [https://docs.google.com/document/d/1v1PRYC6IbkbMk_QroFYhu9DgfvxmmvdbBNOFAeM5oyQ/edit#heading=h.8yg4yayh6uqk]
 
* '''Next we will:''' Finalize a new Research Plan to test our hypothesis [https://docs.google.com/document/d/12pSCJyFMqwM1lw5yeYd6EKFzL3ok1fFpHwLa-3TQxCY].
'''NEW HYPOTHESIS'''
 
'''We believe that''' ''people want to communicate their love for other people without the stress or FOMO of 2-way communication methods like text messages.''
 
'''Creating''' ''an ambient method of communicating with loved ones'' '''for''' ''12 to 15 year old girls'' '''will'''
 
* ''Increase their personal connections / bring their world closer''
* ''Reduce the need to communicate via 2-way methods that distract them from being in the moment at home and at school''
* ''Reduce parents’ anxieties about the amount of time children stare at their phones''
 
'''We will know this is true when we see'''
 
* ''Use of and satisfaction with this method/device''
* ''Reduction in phone use for communicating “I care” messages''
* ''Reduction in parents’ anxieties''
 
'''Next we will:''' Finalize a new Research Plan to test our hypothesis [https://docs.google.com/document/d/12pSCJyFMqwM1lw5yeYd6EKFzL3ok1fFpHwLa-3TQxCY].
|-
|-
| [[Connected_Devices/Projects/Project_Magnet|Project Magnet]]
| [[Connected_Devices/Projects/Project_Magnet|Project Magnet]]
Line 58: Line 85:
! style="background:#00EC00;" | On Target
! style="background:#00EC00;" | On Target
|  
|  
* Development continues with the tasks committed for Sprint 1.
* Development continues with the tasks committed for [[Connected_Devices/Projects/Magnet/Sprint_1|Sprint 1]].
** We have already a very basic client for Android and iOS, and the team is working to have downloadable builds.
** We have already a very basic client for Android and iOS, and the team is working to have downloadable builds.
* Legal team is working in setting up a development account for Connected Devices  to enroll in the Apple Developer program (so we can have versions of the Magnet App for iOS and sign our builds). It's been tracked in [https://bugzilla.mozilla.org/show_bug.cgi?id=1266923 Bug 1266923].
* Legal team is working in setting up a development account for Connected Devices  to enroll in the Apple Developer program (so we can have versions of the Magnet App for iOS and sign our builds). It's been tracked in [https://bugzilla.mozilla.org/show_bug.cgi?id=1266923 Bug 1266923].
Line 69: Line 96:
! style="background:#00EC00;" | On Target
! style="background:#00EC00;" | On Target
|  
|  
* Bulleted list item
*General updates
* Bulleted list item
** MVP up and running.
*** http://blog.sensorweb.io/2016/04/24/release-pre-alpha-0-0-1/
** 1st deployment success in a school
*** http://blog.sensorweb.io/2016/04/26/our-first-user-ping-sing-elementary-school/
* What’s done
** lots of bug fixes, and polishes
** intro video
** talked with legal to spot check: will followup on terms of use, user data, login credential
* What’s next
** portal refinement (adding intro video, etc etc)
** maker faire taipei on 5/7, 5/8
** sensor and kit partners: talking to MTK, Particle
** keep on deploying to schools
** technical review with Dylan this week
* Upcoming Milestone:
** Planned second PIB update on 5/4
** London ww: hackathon (in planning), open session (in planning)
 
|-
|-
| [https://developer.mozilla.org/en-US/docs/Mozilla/Firefox_OS/Porting_Firefox_OS/basics Porting]
| [https://developer.mozilla.org/en-US/docs/Mozilla/Firefox_OS/Porting_Firefox_OS/basics Porting]
Line 76: Line 120:
! style="background:#00EC00;" | On Target
! style="background:#00EC00;" | On Target
|  
|  
* Bulleted list item
B2G add-on installer
* Bulleted list item
* Continuing to get usage, someone found some “issues”
* Collecting metrics for usage and looking to build a dashboard
 
|-
|-
| [[Connected_Devices/Projects/Metrics|Metrics for CD]]
| [[Connected_Devices/Projects/Metrics|Metrics for CD]]
Line 83: Line 129:
! style="background:#00EC00;" | On Target
! style="background:#00EC00;" | On Target
|  
|  
* Bulleted list item
* The team continues the investigation of other third party solutions (instead of the Telemetry pipeline) and also visualization tools
* Bulleted list item
* We hope we can make a decission during this week. [https://docs.google.com/spreadsheets/d/1zMgrunttlH0qSr-2qpiIAPb6DPo837V68AGYmJYCPME/edit#gid=0 investigation info]
* For the time being the option Amazon Mobile Analytics + Periscope seems the better option
|-
|-
| [https://wiki.mozilla.org/Connected_Devices/Research Research Team]
| [https://wiki.mozilla.org/Connected_Devices/Research Research Team]
Line 90: Line 137:
! style="background:#00EC00;" | On Target
! style="background:#00EC00;" | On Target
|  
|  
* Bulleted list item
* '''Technical Research'''
* Bulleted list item
* Started to look into Beacons for the Magnet team
**Competitive analysis of the market
**Basic specs
***Developer Experience
***how is it to set up
***easy to switch out?
* Working on a review of OpenHAB and Link
**Review the lift and capabilities of OpenHAB
* Moving forward with a deeper dive into sensors and what the possibilities are
* '''Market Research'''
* Updated [https://wiki.mozilla.org/Connected_Devices/WeeklyUpdates Market Research Resources page]
*  Smart Home
** Looking into addressable market size for the 12 - 15 years old target and research about their lifestyle
** Looking for research about habit formation
* '''User Research'''
** The first train to be focused on for user research will be Vaani
|-
|-
! rowspan = "4" | Firefox OS Smartphone Sunset
! rowspan = "3" | Firefox OS Smartphone Sunset
[https://wiki.mozilla.org/Smartphone_Transition Smartphone Transition Wiki]
[https://wiki.mozilla.org/Smartphone_Transition Smartphone Transition Wiki]
| Smartphone Commercial Sunset (Karen)
| Smartphone Commercial Sunset (Karen)
Line 99: Line 161:
|  
|  
* [https://wiki.mozilla.org/Smartphone_Commercial_Transition Smartphone Commercial Transition Wiki]
* [https://wiki.mozilla.org/Smartphone_Commercial_Transition Smartphone Commercial Transition Wiki]
*  
* Plan to continue support thru Q1 2018 but have some logistics to resolve for the period from Jan 1 2017 to March 31 2018.  Will continue to keep an eye on that.
*
|-
|-
| Code Transition (Julie)
| Code Transition (Julie)
Line 106: Line 167:
|  
|  
* [https://wiki.mozilla.org/SmartPhone_Code_Transition Smartphone Code Transition Wiki]
* [https://wiki.mozilla.org/SmartPhone_Code_Transition Smartphone Code Transition Wiki]
*  
* Web Activities and System Messages APIs removed
*  
* Landed new Places database
*  
* Now working on getting homescreen, search and dialer working and cleaning up more APIs
*  
* Plan to merge the transition branches back into master shortly afterwards TV branches 2.6 this week
*
|-
| Foxfooding (Jean)
! style="background:#00EC00;" | On Target
|
*
*
|-
|-
| Transition to Volunteer Community (George)
| Transition to Volunteer Community (George)
Line 124: Line 176:
|  
|  
* [https://wiki.mozilla.org/B2G/Transition_Project B2G OS Transition Wiki]
* [https://wiki.mozilla.org/B2G/Transition_Project B2G OS Transition Wiki]
*  
* Holding meetings for volunteers interested in carrying project forward
*  
* More information can be found at [https://discourse.mozilla-community.org/c/firefox-os-participation/b2g-os-transition B2G Transition Working Groups]
|-
| [[Connected_Devices/Participation|Participation Update]]
|
! style="background:#00EC00;" | On Target
|
* Bulleted list item
* Bulleted list item
|-
| Other Announcements
| --
| --
|
* Bulleted list item
* Bulleted list item
|-
| Questions
| --
| --
|
* Bulleted list item
* Bulleted list item
|-
|-
|}
|}

Latest revision as of 23:59, 26 April 2016

<< Connected Devices Weekly Updates Home

Program Status Notes
Vaani Validation (Lindsay/Sandip) On Target
  • Product
    • Work week in Portland last week
    • Choosing Hypothesis to test and priorities
    • Working with User Research to find the best ways to test the Hypothesis
  • Engineering
    • Reviewing Feedback from the Berlin event
    • Getting ready to Demo to the exec team tomorrow (come check it out)
    • Working on Pocketsphinx STT Implementation
    • Will be able to use the offline implementation by the end of this sprint
    • Working on Voice recording and synthesis
    • Ongoing Architecture discussions. How we can achieve skills or Services through Vaani
  • General
    • You can see the sprint items on Trello
    • You can see the weekly meeting notes here
    • Next Demo will be 4/27 it is on the CD calendar
Project Link Validation Stage (Julie/Preeti) On Target

Product and Research

  • Continued brainstorming on product differentiators
  • Working on user segment research and user interviews to gather user pain-points
  • Continuing the evaluation of voice integration options and other possible collaborations
  • Held discussions for next phase targets, will meet again Thursday to finalize direction

Engineering

  • Working on video of first phase demo that shows open/close window sensor, hue lights, and door locks integrated into fox box and working end to end, along with notifications enabled via Web push.
  • Ensuring consistent performance
  • Designing and developing a demo/showcase room for Link devices. Separate VLAN is ready in one of the conference rooms and devices are purchased as well. Ready to be mounted. Hope to use this for the London All Hands video

Participation

  • Will discuss and prioritize how volunteer contributors can help at London All Hands after next steps are agreed upon
Smart TV for 2.6 Josh On Target
  • 4/25 branch - technical issue, should be ready 4/27
  • 7/15 FC
  • 9/1 CC
Smart TV Next Gen Validation (Joe/Josh) On Target
  • Web Apps descoped due to Marketplace team resource issue.
Project SmartHome Maria/Liz On Target

We did/learned: Met in Portland with CD PM and UX teams. Our hypothesis was still pretty broad. So we narrowed and refined it.

NEW HYPOTHESIS

We believe that people want to communicate their love for other people without the stress or FOMO of 2-way communication methods like text messages.

Creating an ambient method of communicating with loved ones for 12 to 15 year old girls will

  • Increase their personal connections / bring their world closer
  • Reduce the need to communicate via 2-way methods that distract them from being in the moment at home and at school
  • Reduce parents’ anxieties about the amount of time children stare at their phones

We will know this is true when we see

  • Use of and satisfaction with this method/device
  • Reduction in phone use for communicating “I care” messages
  • Reduction in parents’ anxieties

Next we will: Finalize a new Research Plan to test our hypothesis [1].

Project Magnet Maria/Francisco On Target
  • Development continues with the tasks committed for Sprint 1.
    • We have already a very basic client for Android and iOS, and the team is working to have downloadable builds.
  • Legal team is working in setting up a development account for Connected Devices to enroll in the Apple Developer program (so we can have versions of the Magnet App for iOS and sign our builds). It's been tracked in Bug 1266923.
  • We have contacted with Scott Jenson who is leading the Physical Web project in Google. He’s going to send us some beacons and offered us to help us to get more through a manufacturer in Shenzhen.
  • We are trying to prepare a real demo in London All Hands using sched application.
  • Sam Foster has started his Research work about Beacons,
Project Sensor Web Cindy/Wesley On Target
Porting Nicole/David/Peter On Target

B2G add-on installer

  • Continuing to get usage, someone found some “issues”
  • Collecting metrics for usage and looking to build a dashboard
Metrics for CD Maria/Dylan On Target
  • The team continues the investigation of other third party solutions (instead of the Telemetry pipeline) and also visualization tools
  • We hope we can make a decission during this week. investigation info
  • For the time being the option Amazon Mobile Analytics + Periscope seems the better option
Research Team Lindsay On Target
  • Technical Research
  • Started to look into Beacons for the Magnet team
    • Competitive analysis of the market
    • Basic specs
      • Developer Experience
      • how is it to set up
      • easy to switch out?
  • Working on a review of OpenHAB and Link
    • Review the lift and capabilities of OpenHAB
  • Moving forward with a deeper dive into sensors and what the possibilities are
  • Market Research
  • Updated Market Research Resources page
  • Smart Home
    • Looking into addressable market size for the 12 - 15 years old target and research about their lifestyle
    • Looking for research about habit formation
  • User Research
    • The first train to be focused on for user research will be Vaani
Firefox OS Smartphone Sunset

Smartphone Transition Wiki

Smartphone Commercial Sunset (Karen) On Target
  • Smartphone Commercial Transition Wiki
  • Plan to continue support thru Q1 2018 but have some logistics to resolve for the period from Jan 1 2017 to March 31 2018. Will continue to keep an eye on that.
Code Transition (Julie) On Target
  • Smartphone Code Transition Wiki
  • Web Activities and System Messages APIs removed
  • Landed new Places database
  • Now working on getting homescreen, search and dialer working and cleaning up more APIs
  • Plan to merge the transition branches back into master shortly afterwards TV branches 2.6 this week
Transition to Volunteer Community (George) On Target