Apps/StatusMeetings/Engineering/2012-10-03: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
mNo edit summary
 
(4 intermediate revisions by 2 users not shown)
Line 20: Line 20:
* Significant Updates
* Significant Updates
* Checkin/Status on Major Challenges
* Checkin/Status on Major Challenges
** Aligning with Telefonica on [https://docs.google.com/spreadsheet/ccc?key=0Ajt_meMlK3MOdHphdnV2a2RvcU9MZmd3cDlIQnZBMVE#gid=1 scope for feature freeze]. Special focus on apps updates/installs and payments. Does the apps / Marketplace team need anything else?
** Aligning with Telefonica on [https://docs.google.com/spreadsheet/ccc?key=0Ajt_meMlK3MOdHphdnV2a2RvcU9MZmd3cDlIQnZBMVE#gid=1 scope for feature freeze]. Special focus on apps updates/installs and payments. Does the apps / Marketplace team need anything else? (Caitlin)
** Marketplace Payments
*** [https://wiki.mozilla.org/Apps/ID_and_Payments Master Spec]
* Questions and Concerns
* Questions and Concerns
** [https://docs.google.com/presentation/d/1KYHIF86l8kXhC5_gvEeBt3goPBeCN6PnQvEOluEBPLE/edit Roadshow for Apps Ecosystem FFOS Basecamp (Published Weekly - Updated Wednesday nights)]
** [https://docs.google.com/presentation/d/1KYHIF86l8kXhC5_gvEeBt3goPBeCN6PnQvEOluEBPLE/edit Roadshow for Apps Ecosystem FFOS Basecamp (Published Weekly - Updated Wednesday nights)]
** status on infrastructure / ops - dedicated marketplace and high availability? Toby / Mark do you need the apps or marketplace team for any additional workflow understanding? (Caitlin)


== P2/3 Other Projects ==
== P2/3 Other Projects ==
Line 31: Line 34:


= Minutes =
= Minutes =
== Basecamp feature freeze ==
* we've passed feature deadline for Basecamp (feature freeze for first phone)
* document describing user scenarios: https://docs.google.com/spreadsheet/ccc?key=0Ajt_meMlK3MOdHphdnV2a2RvcU9MZmd3cDlIQnZBMVE#gid=1
* apps/marketplace user stories are not yet well-represented on that doc
* pmpcat will be coordinating with mike treese to make sure doc includes those stories
* pmpcat will loop in clouserw, jsmith, kward
== marketplace branding ==
* is the icon on the device the final icon?
* branding is not yet complete for firefox os
* marketplace icon will go through some iteration and change
== grid negotiations ==
* mozilla and telefonica negotiating what appears on home screens of phone
* marketplace will be on screen one, top left
== firefox os simulator ==
* meeting this week to discuss status
* small event in brazil on october 20 for which tool would be useful
* adora could use tool right away to show developers what she sees in reviews
== marketplace & payments integration ==
* details: https://wiki.mozilla.org/Apps/ID_and_Payments
* kumar testing payments integration with payment processor's sandbox
* kumar has demo up and running that works on t-mobile but not on at&t yet
* blocked on doing some work in the sandbox by lack of finalized contract
* payment provider waiting for finalized contract
* rfant is working on it, it's looking good
== roadshow updates ==
* used for reporting up to management about progress of project
* published wednesday evenings, so this meeting can inform it
* not particularly useful for engineers working on the project, who will already know this info
* https://docs.google.com/presentation/d/1KYHIF86l8kXhC5_gvEeBt3goPBeCN6PnQvEOluEBPLE/edit
== infrastructure ==
* how are we doing on having high availability for marketplace?
* ops team is meeting in two hours (11am PT)
* will be talking about SLAs
* outcome of meeting will determine budget
* anything ops needs from marketplace team?
* not at this time, right now ops has good sense of project
* rfant has spreadsheet approximating volume by country, will provide to telliott
== GitHub -> Bugzilla Gaia bug migration ==
* 567 GitHub bugs have been migrated to Bugzilla
* includes apps bugs and payments bugs
* file frontend (Gaia) bugs into B2G/Gaia
* https://bugzilla.mozilla.org/enter_bug.cgi?product=Boot2Gecko&component=Gaia
== Android ==
* how are we doing in terms of Marketplace readiness?
* things are looking good
* on october 18 we plan to take down login wall
* releases page is under construction
* https://wiki.mozilla.org/Marketplace/Releases
* might add metrics, but that is at risk
* dhorner has sent metrics needs to folks
* clouserw met with folks a couple days ago
* we don't need metrics for october 18
* this is not a marketing release
* -> dbialer to share metrics requirements with apps project
* apps folks talking to privacy folks?
* pmpcat talking and will engage them on metrics
* android go/no-go meeting on Tuesday, October 9
== everything.me ==
* in the process of finalizing grid--home screen of app--and left and right swipes
* everything.me will be on the left swipe screen
* everything.me is a portal for mobilized sites, a long list of icons to games and other things
* also includes a search mechanism
* alternate discovery mechanism for mobilized web content
* desired by telefonica, we agreed to it a while ago
* has a number of problems, including need to be online all the time
* not a direct competitor to marketplace
* working with them on rev share and getting interesting content from them into marketplace
* not using mozApps API, use a custom API
* don't go through a real install process, but it looks to the user like an install
* unclear why, but that's the way it'll be for v1
* everything.me reps will be in MV office october 15 to discuss issues
* get issues to kward and rfant by then for discussion at that time!
* telefonica-specific? yes, right now it is
* but mozilla is contractually-obligated to offer it to other carriers
* what about apps that are available from both everything.me and also are pre-installed on device (like twitter)?
* multiple ways to get apps -- strength of the open web!
== marco presentation ==
* marco is going to event in italy around october 20 and working with jsmith on presentation regarding webapps quality
* https://etherpad.mozilla.org/QTPoNJMjAF
* why not show r2d2b2g tool at event?
* marco should talk to devengage folks via mailing list
* http://www.mozilla.org/about/forums/#engagement-developers
* they have lots of materials he can use


= Actions =
= Actions =
* dbialer to share metrics requirements with apps project

Latest revision as of 17:29, 3 October 2012

Details

Agenda

P1 Firefox OS Basecamp

P2/3 Other Projects

  • Significant Updates
  • Checkin/Status on Major Challenges
  • Questions and Concerns

Minutes

Basecamp feature freeze

marketplace branding

  • is the icon on the device the final icon?
  • branding is not yet complete for firefox os
  • marketplace icon will go through some iteration and change

grid negotiations

  • mozilla and telefonica negotiating what appears on home screens of phone
  • marketplace will be on screen one, top left

firefox os simulator

  • meeting this week to discuss status
  • small event in brazil on october 20 for which tool would be useful
  • adora could use tool right away to show developers what she sees in reviews

marketplace & payments integration

  • blocked on doing some work in the sandbox by lack of finalized contract
  • payment provider waiting for finalized contract
  • rfant is working on it, it's looking good

roadshow updates

infrastructure

  • how are we doing on having high availability for marketplace?
  • ops team is meeting in two hours (11am PT)
  • will be talking about SLAs
  • outcome of meeting will determine budget
  • anything ops needs from marketplace team?
  • not at this time, right now ops has good sense of project
  • rfant has spreadsheet approximating volume by country, will provide to telliott

GitHub -> Bugzilla Gaia bug migration

Android

  • how are we doing in terms of Marketplace readiness?
  • things are looking good
  • on october 18 we plan to take down login wall
  • might add metrics, but that is at risk
  • dhorner has sent metrics needs to folks
  • clouserw met with folks a couple days ago
  • we don't need metrics for october 18
  • this is not a marketing release
  • -> dbialer to share metrics requirements with apps project
  • apps folks talking to privacy folks?
  • pmpcat talking and will engage them on metrics
  • android go/no-go meeting on Tuesday, October 9

everything.me

  • in the process of finalizing grid--home screen of app--and left and right swipes
  • everything.me will be on the left swipe screen
  • everything.me is a portal for mobilized sites, a long list of icons to games and other things
  • also includes a search mechanism
  • alternate discovery mechanism for mobilized web content
  • desired by telefonica, we agreed to it a while ago
  • has a number of problems, including need to be online all the time
  • not a direct competitor to marketplace
  • working with them on rev share and getting interesting content from them into marketplace
  • not using mozApps API, use a custom API
  • don't go through a real install process, but it looks to the user like an install
  • unclear why, but that's the way it'll be for v1
  • everything.me reps will be in MV office october 15 to discuss issues
  • get issues to kward and rfant by then for discussion at that time!
  • telefonica-specific? yes, right now it is
  • but mozilla is contractually-obligated to offer it to other carriers
  • what about apps that are available from both everything.me and also are pre-installed on device (like twitter)?
  • multiple ways to get apps -- strength of the open web!

marco presentation

Actions

  • dbialer to share metrics requirements with apps project