Apps/StatusMeetings/Engineering/2012-10-03: Difference between revisions
< Apps | StatusMeetings | Engineering
Jump to navigation
Jump to search
mNo edit summary |
|||
(3 intermediate revisions by 2 users not shown) | |||
Line 21: | Line 21: | ||
* Checkin/Status on Major Challenges | * Checkin/Status on Major Challenges | ||
** Aligning with Telefonica on [https://docs.google.com/spreadsheet/ccc?key=0Ajt_meMlK3MOdHphdnV2a2RvcU9MZmd3cDlIQnZBMVE#gid=1 scope for feature freeze]. Special focus on apps updates/installs and payments. Does the apps / Marketplace team need anything else? (Caitlin) | ** Aligning with Telefonica on [https://docs.google.com/spreadsheet/ccc?key=0Ajt_meMlK3MOdHphdnV2a2RvcU9MZmd3cDlIQnZBMVE#gid=1 scope for feature freeze]. Special focus on apps updates/installs and payments. Does the apps / Marketplace team need anything else? (Caitlin) | ||
** Marketplace Payments | |||
*** [https://wiki.mozilla.org/Apps/ID_and_Payments Master Spec] | |||
* Questions and Concerns | * Questions and Concerns | ||
** [https://docs.google.com/presentation/d/1KYHIF86l8kXhC5_gvEeBt3goPBeCN6PnQvEOluEBPLE/edit Roadshow for Apps Ecosystem FFOS Basecamp (Published Weekly - Updated Wednesday nights)] | ** [https://docs.google.com/presentation/d/1KYHIF86l8kXhC5_gvEeBt3goPBeCN6PnQvEOluEBPLE/edit Roadshow for Apps Ecosystem FFOS Basecamp (Published Weekly - Updated Wednesday nights)] | ||
** status on infrastructure / ops - dedicated marketplace and high availability? (Caitlin) | ** status on infrastructure / ops - dedicated marketplace and high availability? Toby / Mark do you need the apps or marketplace team for any additional workflow understanding? (Caitlin) | ||
== P2/3 Other Projects == | == P2/3 Other Projects == | ||
Line 32: | Line 34: | ||
= Minutes = | = Minutes = | ||
== Basecamp feature freeze == | |||
* we've passed feature deadline for Basecamp (feature freeze for first phone) | |||
* document describing user scenarios: https://docs.google.com/spreadsheet/ccc?key=0Ajt_meMlK3MOdHphdnV2a2RvcU9MZmd3cDlIQnZBMVE#gid=1 | |||
* apps/marketplace user stories are not yet well-represented on that doc | |||
* pmpcat will be coordinating with mike treese to make sure doc includes those stories | |||
* pmpcat will loop in clouserw, jsmith, kward | |||
== marketplace branding == | |||
* is the icon on the device the final icon? | |||
* branding is not yet complete for firefox os | |||
* marketplace icon will go through some iteration and change | |||
== grid negotiations == | |||
* mozilla and telefonica negotiating what appears on home screens of phone | |||
* marketplace will be on screen one, top left | |||
== firefox os simulator == | |||
* meeting this week to discuss status | |||
* small event in brazil on october 20 for which tool would be useful | |||
* adora could use tool right away to show developers what she sees in reviews | |||
== marketplace & payments integration == | |||
* details: https://wiki.mozilla.org/Apps/ID_and_Payments | |||
* kumar testing payments integration with payment processor's sandbox | |||
* kumar has demo up and running that works on t-mobile but not on at&t yet | |||
* blocked on doing some work in the sandbox by lack of finalized contract | |||
* payment provider waiting for finalized contract | |||
* rfant is working on it, it's looking good | |||
== roadshow updates == | |||
* used for reporting up to management about progress of project | |||
* published wednesday evenings, so this meeting can inform it | |||
* not particularly useful for engineers working on the project, who will already know this info | |||
* https://docs.google.com/presentation/d/1KYHIF86l8kXhC5_gvEeBt3goPBeCN6PnQvEOluEBPLE/edit | |||
== infrastructure == | |||
* how are we doing on having high availability for marketplace? | |||
* ops team is meeting in two hours (11am PT) | |||
* will be talking about SLAs | |||
* outcome of meeting will determine budget | |||
* anything ops needs from marketplace team? | |||
* not at this time, right now ops has good sense of project | |||
* rfant has spreadsheet approximating volume by country, will provide to telliott | |||
== GitHub -> Bugzilla Gaia bug migration == | |||
* 567 GitHub bugs have been migrated to Bugzilla | |||
* includes apps bugs and payments bugs | |||
* file frontend (Gaia) bugs into B2G/Gaia | |||
* https://bugzilla.mozilla.org/enter_bug.cgi?product=Boot2Gecko&component=Gaia | |||
== Android == | |||
* how are we doing in terms of Marketplace readiness? | |||
* things are looking good | |||
* on october 18 we plan to take down login wall | |||
* releases page is under construction | |||
* https://wiki.mozilla.org/Marketplace/Releases | |||
* might add metrics, but that is at risk | |||
* dhorner has sent metrics needs to folks | |||
* clouserw met with folks a couple days ago | |||
* we don't need metrics for october 18 | |||
* this is not a marketing release | |||
* -> dbialer to share metrics requirements with apps project | |||
* apps folks talking to privacy folks? | |||
* pmpcat talking and will engage them on metrics | |||
* android go/no-go meeting on Tuesday, October 9 | |||
== everything.me == | |||
* in the process of finalizing grid--home screen of app--and left and right swipes | |||
* everything.me will be on the left swipe screen | |||
* everything.me is a portal for mobilized sites, a long list of icons to games and other things | |||
* also includes a search mechanism | |||
* alternate discovery mechanism for mobilized web content | |||
* desired by telefonica, we agreed to it a while ago | |||
* has a number of problems, including need to be online all the time | |||
* not a direct competitor to marketplace | |||
* working with them on rev share and getting interesting content from them into marketplace | |||
* not using mozApps API, use a custom API | |||
* don't go through a real install process, but it looks to the user like an install | |||
* unclear why, but that's the way it'll be for v1 | |||
* everything.me reps will be in MV office october 15 to discuss issues | |||
* get issues to kward and rfant by then for discussion at that time! | |||
* telefonica-specific? yes, right now it is | |||
* but mozilla is contractually-obligated to offer it to other carriers | |||
* what about apps that are available from both everything.me and also are pre-installed on device (like twitter)? | |||
* multiple ways to get apps -- strength of the open web! | |||
== marco presentation == | |||
* marco is going to event in italy around october 20 and working with jsmith on presentation regarding webapps quality | |||
* https://etherpad.mozilla.org/QTPoNJMjAF | |||
* why not show r2d2b2g tool at event? | |||
* marco should talk to devengage folks via mailing list | |||
* http://www.mozilla.org/about/forums/#engagement-developers | |||
* they have lots of materials he can use | |||
= Actions = | = Actions = | ||
* dbialer to share metrics requirements with apps project |
Latest revision as of 17:29, 3 October 2012
Details
- Time: 9:05 - 9:55 AM PT (16:05 - 16:55 UTC)
- Backchannel:
- Virtual Location:
- Physical Locations:
- Mountain View: 3A - All Your Base
- San Francisco: 324 - Bay Bridge
- Audio-only Access:
- +1-650-903-0800 or +1-650-215-1282, x92, conf#: 98652 (US/INTL)
- +1-800-707-2533, pin: 369, conf#: 98652 (US toll free)
- etherpad for taking minutes
Agenda
P1 Firefox OS Basecamp
- Significant Updates
- Checkin/Status on Major Challenges
- Aligning with Telefonica on scope for feature freeze. Special focus on apps updates/installs and payments. Does the apps / Marketplace team need anything else? (Caitlin)
- Marketplace Payments
- Questions and Concerns
- Roadshow for Apps Ecosystem FFOS Basecamp (Published Weekly - Updated Wednesday nights)
- status on infrastructure / ops - dedicated marketplace and high availability? Toby / Mark do you need the apps or marketplace team for any additional workflow understanding? (Caitlin)
P2/3 Other Projects
- Significant Updates
- Checkin/Status on Major Challenges
- Questions and Concerns
Minutes
Basecamp feature freeze
- we've passed feature deadline for Basecamp (feature freeze for first phone)
- document describing user scenarios: https://docs.google.com/spreadsheet/ccc?key=0Ajt_meMlK3MOdHphdnV2a2RvcU9MZmd3cDlIQnZBMVE#gid=1
- apps/marketplace user stories are not yet well-represented on that doc
- pmpcat will be coordinating with mike treese to make sure doc includes those stories
- pmpcat will loop in clouserw, jsmith, kward
marketplace branding
- is the icon on the device the final icon?
- branding is not yet complete for firefox os
- marketplace icon will go through some iteration and change
grid negotiations
- mozilla and telefonica negotiating what appears on home screens of phone
- marketplace will be on screen one, top left
firefox os simulator
- meeting this week to discuss status
- small event in brazil on october 20 for which tool would be useful
- adora could use tool right away to show developers what she sees in reviews
marketplace & payments integration
- details: https://wiki.mozilla.org/Apps/ID_and_Payments
- kumar testing payments integration with payment processor's sandbox
- kumar has demo up and running that works on t-mobile but not on at&t yet
- blocked on doing some work in the sandbox by lack of finalized contract
- payment provider waiting for finalized contract
- rfant is working on it, it's looking good
roadshow updates
- used for reporting up to management about progress of project
- published wednesday evenings, so this meeting can inform it
- not particularly useful for engineers working on the project, who will already know this info
- https://docs.google.com/presentation/d/1KYHIF86l8kXhC5_gvEeBt3goPBeCN6PnQvEOluEBPLE/edit
infrastructure
- how are we doing on having high availability for marketplace?
- ops team is meeting in two hours (11am PT)
- will be talking about SLAs
- outcome of meeting will determine budget
- anything ops needs from marketplace team?
- not at this time, right now ops has good sense of project
- rfant has spreadsheet approximating volume by country, will provide to telliott
GitHub -> Bugzilla Gaia bug migration
- 567 GitHub bugs have been migrated to Bugzilla
- includes apps bugs and payments bugs
- file frontend (Gaia) bugs into B2G/Gaia
- https://bugzilla.mozilla.org/enter_bug.cgi?product=Boot2Gecko&component=Gaia
Android
- how are we doing in terms of Marketplace readiness?
- things are looking good
- on october 18 we plan to take down login wall
- releases page is under construction
- https://wiki.mozilla.org/Marketplace/Releases
- might add metrics, but that is at risk
- dhorner has sent metrics needs to folks
- clouserw met with folks a couple days ago
- we don't need metrics for october 18
- this is not a marketing release
- -> dbialer to share metrics requirements with apps project
- apps folks talking to privacy folks?
- pmpcat talking and will engage them on metrics
- android go/no-go meeting on Tuesday, October 9
everything.me
- in the process of finalizing grid--home screen of app--and left and right swipes
- everything.me will be on the left swipe screen
- everything.me is a portal for mobilized sites, a long list of icons to games and other things
- also includes a search mechanism
- alternate discovery mechanism for mobilized web content
- desired by telefonica, we agreed to it a while ago
- has a number of problems, including need to be online all the time
- not a direct competitor to marketplace
- working with them on rev share and getting interesting content from them into marketplace
- not using mozApps API, use a custom API
- don't go through a real install process, but it looks to the user like an install
- unclear why, but that's the way it'll be for v1
- everything.me reps will be in MV office october 15 to discuss issues
- get issues to kward and rfant by then for discussion at that time!
- telefonica-specific? yes, right now it is
- but mozilla is contractually-obligated to offer it to other carriers
- what about apps that are available from both everything.me and also are pre-installed on device (like twitter)?
- multiple ways to get apps -- strength of the open web!
marco presentation
- marco is going to event in italy around october 20 and working with jsmith on presentation regarding webapps quality
- https://etherpad.mozilla.org/QTPoNJMjAF
- why not show r2d2b2g tool at event?
- marco should talk to devengage folks via mailing list
- http://www.mozilla.org/about/forums/#engagement-developers
- they have lots of materials he can use
Actions
- dbialer to share metrics requirements with apps project