Breakpad/Status Meetings/2013-November-20: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
 
(5 intermediate revisions by 5 users not shown)
Line 30: Line 30:
= topics/issues to discuss =
= topics/issues to discuss =
* [http://etherpad.mozilla.org/webeng-2014-goals High level goals for 2014]
* [http://etherpad.mozilla.org/webeng-2014-goals High level goals for 2014]
* Config complexity has blocked us from shipping twice in a row, and caused problems shipping on numerous other occasions.
** Review it, see where we can simplify. (lars, rhelmer?) (see Bug 938268)
** Improve integration tests. Run them in anticipation of config changes. (peterbe, rhelmer)


= Ops Updates =
= Ops Updates =


== Actively working on ==
== Actively working on ==
* migrate crashanalysis configs from sp-web* to socorro*.webapp.phx
* extracting secrets from config files + Puppet managed templates for secret includes
* move prod to use rsync based deploys (like stage does)


= PTOs =
= PTOs =
* laura in .ch Sat 16 - Wed 20 Nov for EBUDevCon. Need someone to run this meeting next week.
* laura in .ch Sat 16 - Wed 20 Nov for EBUDevCon. Need someone to run this meeting next week.
* lars out most of Thursday (after 8am) and all of Friday
* lars in a very remote location next week - maybe dial up access, maybe not.
* mbrandt PTO for the month of December
* peterbe out Monday 25, Tuesday 26
* rhelmer half-day Friday November 22


= Links =
= Links =
* [https://etherpad.mozilla.org/webeng-q42013 q4 goals]
* [https://etherpad.mozilla.org/webeng-q42013 q4 goals]

Latest revision as of 19:10, 20 November 2013

Meeting Info

Breakpad status meetings occur on Wed at 11:00am Pacific Time.

Conference numbers:

   Vidyo: Stability 
   650-903-0800 x92 conf 98200#
   800-707-2533 (pin 369) conf 98200# 

IRC backchannel: #breakpad Mountain View: Dancing Baby (3rd floor)


Socorro Release Tracker
Socorro Bug Tracker

66

Full Query
ID Summary Assigned to Target milestone Priority Status Resolution Whiteboard
753686 15,000 DOM elements and 45 seconds worth of GET requests on a single page for Firefox topcrashers Schalk Neethling [:espressive] 66 -- VERIFIED FIXED [QA+]
789526 Empty, non-plotted graphs for signatures in topcrasher by build date Schalk Neethling [:espressive] 66 -- VERIFIED FIXED [qa+]
931147 better logging of failed transactions K Lars Lohn [:lars] [:klohn] 66 -- RESOLVED FIXED
931242 More fine grained permissions for access to sensitive data Peter Bengtsson [:peterbe] 66 -- VERIFIED FIXED [Config changes][qa+]
932064 Add duration of jobs to crontabber_log table Peter Bengtsson [:peterbe] 66 -- RESOLVED FIXED
933443 TypeError: columns is undefined @ https://crash-stats.allizom.org/static/CACHE/js/ff532ddaa571.js:39 when no table exists Schalk Neethling [:espressive] 66 -- VERIFIED FIXED
935620 silence debug/info output on stderr during tests K Lars Lohn [:lars] [:klohn] 66 -- VERIFIED FIXED [qa-]
935621 Search and replace on test data terms Selena Deckelmann :selenamarie :selena 66 -- VERIFIED FIXED [qa-]
937376 HBase pooled storage class in the hb tree is defective K Lars Lohn [:lars] [:klohn] 66 -- VERIFIED FIXED
938601 HybridCrashProcessor putting line feeds in pipe dump K Lars Lohn [:lars] [:klohn] 66 -- RESOLVED FIXED
939141 Annotate the largest free VM block in JSON MDSW (Windows) Benjamin Smedberg 66 -- RESOLVED FIXED
940499 add 'support' classifier system to the processor K Lars Lohn [:lars] [:klohn] 66 -- RESOLVED FIXED
941070 quiet the noisy support classifier K Lars Lohn [:lars] [:klohn] 66 -- RESOLVED FIXED
941092 [stage][regression] The reports tab does not load 66 -- VERIFIED WORKSFORME [stage][regression]
941151 [stage][traceback] Viewing reports for Firefox 26.0b and Firefox 25.0 result in a 500 error 66 -- VERIFIED FIXED [stage]

15 Total; 0 Open (0%); 6 Resolved (40%); 9 Verified (60%);


PR Triage

topics/issues to discuss

Ops Updates

Actively working on

  • migrate crashanalysis configs from sp-web* to socorro*.webapp.phx
  • extracting secrets from config files + Puppet managed templates for secret includes
  • move prod to use rsync based deploys (like stage does)

PTOs

  • laura in .ch Sat 16 - Wed 20 Nov for EBUDevCon. Need someone to run this meeting next week.
  • lars in a very remote location next week - maybe dial up access, maybe not.
  • mbrandt PTO for the month of December
  • peterbe out Monday 25, Tuesday 26
  • rhelmer half-day Friday November 22

Links