Line 5: | Line 5: | ||
** mconnor will include descending order of importance of unit tests along with the engineering plan he'll send out by Tuesday evening. | ** mconnor will include descending order of importance of unit tests along with the engineering plan he'll send out by Tuesday evening. | ||
** Toby is going to write up migration scripts to get users migrated to new server platform. | ** Toby is going to write up migration scripts to get users migrated to new server platform. | ||
** [https://wiki.mozilla.org/QA/Weave_Test_Plan Weave QA Test Strategy] created. This is the overview landing page for tracking Testing work for Weave all. | |||
** 1.3 server will be code frozen this Friday. | ** 1.3 server will be code frozen this Friday. | ||
** 1.3 QA test plan | ** [https://wiki.mozilla.org/QA/Weave_Test_Plan/1.3 1.3 QA test plan] | ||
** Interaction flows (thanks to mconnor: http://etherpad.mozilla. | ** Interaction flows (thanks to mconnor: http://etherpad.mozilla.org:9000/weave-use-cases) | ||
* Other items: | * Other items: | ||
** Usability study findings and next steps. | ** Usability study findings and next steps. | ||
Line 13: | Line 14: | ||
** Meeting format change. | ** Meeting format change. | ||
** iPhone client status. | ** iPhone client status. | ||
Notes: | Notes: | ||
* 1.2 was released on Friday, missed some perf issues with large sets of form data. Had to release 1.2.1 over the weekend when we removed caps on form history. | |||
* '''AI:''' We need to do a first sync with a large profile (QA probably has designated fat profiles). Needs to be in the test plan. Owner: Tony. | |||
* 45 writes/sec on low end test hardware. | |||
* 100 successful auth/second maybe. Aravind is going to run the numbers on the new hardware. | |||
* Toby is almost done with migration scripts, should be done by tomorrow. | |||
* Matt/QA working on a load testing plan, still some confusion about load testing, scope and ownership. Ragavan/Matt/Justin to discuss offline. | |||
* 1.3 server not quite done, some security bugs have been punted to beyond 1.3. Mconnor/Ragavan/Toby to sync up on gaps and next steps. | |||
* QA test day planned for April 23. | |||
* 1.3 bug triage tomorrow. |
Latest revision as of 20:06, 19 November 2013
Agenda:
- 1.2 release (and 1.2.1)
- Follow ups:
- Load tests for user registration/authentication -- looking good?
- mconnor will include descending order of importance of unit tests along with the engineering plan he'll send out by Tuesday evening.
- Toby is going to write up migration scripts to get users migrated to new server platform.
- Weave QA Test Strategy created. This is the overview landing page for tracking Testing work for Weave all.
- 1.3 server will be code frozen this Friday.
- 1.3 QA test plan
- Interaction flows (thanks to mconnor: http://etherpad.mozilla.org:9000/weave-use-cases)
- Other items:
- Usability study findings and next steps.
- 1.3 bug triage.
- Meeting format change.
- iPhone client status.
Notes:
- 1.2 was released on Friday, missed some perf issues with large sets of form data. Had to release 1.2.1 over the weekend when we removed caps on form history.
- AI: We need to do a first sync with a large profile (QA probably has designated fat profiles). Needs to be in the test plan. Owner: Tony.
- 45 writes/sec on low end test hardware.
- 100 successful auth/second maybe. Aravind is going to run the numbers on the new hardware.
- Toby is almost done with migration scripts, should be done by tomorrow.
- Matt/QA working on a load testing plan, still some confusion about load testing, scope and ownership. Ragavan/Matt/Justin to discuss offline.
- 1.3 server not quite done, some security bugs have been punted to beyond 1.3. Mconnor/Ragavan/Toby to sync up on gaps and next steps.
- QA test day planned for April 23.