L10n:Weekly/2012-06-27: Difference between revisions
m (→Acholi (ach)) |
m (→Fulah (ff)) |
||
Line 48: | Line 48: | ||
[https://l10n.mozilla.org/teams/ff dashboard] | [https://l10n.mozilla.org/teams/ff dashboard] | ||
Current build channel: | Current build channel: beta | ||
Blocks to release: | Blocks to release: positive community feedback | ||
Brief summary of interactions with the team from the past week: | Brief summary of interactions with the team from the past week: Nothing to do. | ||
Action items (provide assignments): | Action items (provide assignments): Wait for a week before merge and then talk to Ibrahima/Dwayne. | ||
===Kazakh (kk)=== | ===Kazakh (kk)=== |
Revision as of 13:21, 27 June 2012
Meeting Details
- Time and location: Wednesday, 8 AM PST, conf bridge 206
- irc.mozilla.org #l10n-drivers for back-channel
« previous meeting — index – next week » create?
Previous Action Items
carry-overs
Meeting Notes
- Notetaker:
- Attendees:
- localization of http://www.mozilla.org/en-US/contribute/ into es and pt-BR, see bug 755351 (context: FISL 2012 starts end of July and it might be a good opportunity to grow our LatAm community)
Action Items
carry-overs
New locales updates
Acholi (ach)
Current build channel: aurora
Blocks to release: 2 productization bugs, activity on aurora, stop hand-holding with San James
Brief summary of interactions with the team from the past week: Waiting for activity in bugs - no response
Action items (provide assignments): Get on a call with Dwayne and figure out the next steps
Fulah (ff)
Current build channel: beta
Blocks to release: positive community feedback
Brief summary of interactions with the team from the past week: Nothing to do.
Action items (provide assignments): Wait for a week before merge and then talk to Ibrahima/Dwayne.
Kazakh (kk)
Current build channel:
Blocks to release:
Brief summary of interactions with the team from the past week:
Action items (provide assignments):
Malay (ms)
Current build channel:
Blocks to release:
Brief summary of interactions with the team from the past week:
Action items (provide assignments):
Burmese (my)
Current build channel:
Blocks to release:
Brief summary of interactions with the team from the past week:
Action items (provide assignments):
Maithili (mai)
Current build channel:
Blocks to release:
Brief summary of interactions with the team from the past week:
Action items (provide assignments):
Mongolian (mn)
Current build channel:
Blocks to release:
Brief summary of interactions with the team from the past week:
Action items (provide assignments):