Connected Devices Weekly Update/2016-04-26: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
(porting)
(add sensorweb updates)
Line 70: Line 70:
! style="background:#00EC00;" | On Target
! style="background:#00EC00;" | On Target
|  
|  
* Bulleted list item
*General updates
* Bulleted list item
** MVP up and running.
*** http://blog.sensorweb.io/2016/04/24/release-pre-alpha-0-0-1/
** 1st deployment success in a school
*** http://blog.sensorweb.io/2016/04/26/our-first-user-ping-sing-elementary-school/
* What’s done
** lots of bug fixes, and polishes
** intro video
** talked with legal to spot check: will followup on terms of use, user data, login credential
* What’s next
** portal refinement (adding intro video, etc etc)
** maker faire taipei on 5/7, 5/8
** sensor and kit partners: talking to MTK, Particle
** keep on deploying to schools
** technical review with Dylan this week
* Upcoming Milestone:
** Planned second PIB update on 5/4
** London ww: hackathon (in planning), open session (in planning)
 
|-
|-
| [https://developer.mozilla.org/en-US/docs/Mozilla/Firefox_OS/Porting_Firefox_OS/basics Porting]
| [https://developer.mozilla.org/en-US/docs/Mozilla/Firefox_OS/Porting_Firefox_OS/basics Porting]

Revision as of 15:27, 26 April 2016

<< Connected Devices Weekly Updates Home

Program Status Notes
Vaani Validation (Lindsay/Sandip) On Target
  • Bulleted list item
  • Bulleted list item
Project Link Validation Stage (Julie/Preeti) On Target

Project

UX

Engineering

Participation

Smart TV for 2.6 Josh On Target
  • Bulleted list item
  • Bulleted list item
Smart TV Next Gen Validation (Joe/Josh) On Target
  • 4/25 branch - technical issue, should be ready 4/27
  • TV team preparing sunset plan propose to Ari.
  • Web Apps descoped due to Marketplace team resource issue.
Project SmartHome Maria/Liz On Target
  • We did: Met in Portland with CD PM and UX teams.
  • We learned: Our hypothesis was still pretty broad. So we narrowed and refined it [1]
  • Next we will: Finalize a new Research Plan to test our hypothesis [2].
Project Magnet Maria/Francisco On Target
  • Development continues with the tasks committed for Sprint 1.
    • We have already a very basic client for Android and iOS, and the team is working to have downloadable builds.
  • Legal team is working in setting up a development account for Connected Devices to enroll in the Apple Developer program (so we can have versions of the Magnet App for iOS and sign our builds). It's been tracked in Bug 1266923.
  • We have contacted with Scott Jenson who is leading the Physical Web project in Google. He’s going to send us some beacons and offered us to help us to get more through a manufacturer in Shenzhen.
  • We are trying to prepare a real demo in London All Hands using sched application.
  • Sam Foster has started his Research work about Beacons,
Project Sensor Web Cindy/Wesley On Target
Porting Nicole/David/Peter On Target

B2G add-on installer

  • Continuing to get usage, someone found some “issues”
  • Collecting metrics for usage and looking to build a dashboard
Metrics for CD Maria/Dylan On Target
  • The team continues the investigation of other third party solutions (instead of the Telemetry pipeline) and also visualization tools
  • We hope we can make a discussion during this week. investigation info
  • For the time being the option Amazon Mobile Analytics + Periscope seems the better option
Research Team Lindsay On Target
  • Bulleted list item
  • Bulleted list item
Firefox OS Smartphone Sunset

Smartphone Transition Wiki

Smartphone Commercial Sunset (Karen) On Target
Code Transition (Julie) On Target
Foxfooding (Jean) On Target
Transition to Volunteer Community (George) On Target
Participation Update On Target
  • Bulleted list item
  • Bulleted list item
Other Announcements -- --
  • Bulleted list item
  • Bulleted list item
Questions -- --
  • Bulleted list item
  • Bulleted list item