QA/Test Automation/2010-09-22: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
(→‎Personal: Adrian)
(→‎Personal: Adrian)
Line 129: Line 129:
;Adrian
;Adrian
* Last two weeks:
* Last two weeks:
** {{prev|}} finish Documentation + UML Diagrams for CommonA11yL10nAPI and L10nAPI
** {{prev|}} implementation of the CommonA11yL10nAPI and L10nAPI
* Next two weeks:
** {{done|}} (mostly) finish Documentation + UML Diagrams for CommonA11yL10nAPI (renamed to: DOMUtilitiesAPI) and L10nAPI
** {{done|}} (mostly) finish Documentation + UML Diagrams for CommonA11yL10nAPI (renamed to: DOMUtilitiesAPI) and L10nAPI
** {{done|}} (mostly) implementation of the CommonA11yL10nAPI (renamed to: DOMUtilitiesAPI) and L10nAPI: WIP patch attached to Bug 562084 - including two tests for the preferences window
** {{done|}} (mostly) implementation of the CommonA11yL10nAPI (renamed to: DOMUtilitiesAPI) and L10nAPI: WIP patch attached to Bug 562084 - including two tests for the preferences window
* Next two weeks:
** implement the L10n tests for the update window
** bring the 2 shared-modules and 4 tests through the reviews


=Contributor Status=
=Contributor Status=

Revision as of 20:38, 22 September 2010

previous meeting | Meetings | next meeting »

Dial in

 # 650-903-0800 or 650-215-1282 x92 Conf# 315 (US/INTL)
 # 1-800-707-2533 (pin 369) Conf# 315 (US)
 # irc.mozilla.org #qa for backchannel

Attendees

Last weeks action Items

  • Geo: Send out list of broken tests w/ Fx4 and MM1.5
  • Matt: Check what limits test harnesses on buildbot to use other local webservers (connect with John O'Duin)
  • Matt: Action items from release tasks meeting? Need to notify release leads that they're responsible for coordinating resources.
  • Geo: For Auto-tools meeting next wk, how to incorporate train model going forward
  • Henrik & Matt: How to streamline patch checkin process
  • Geo: Generate wiki page to sum up tab candy objective

Goals Overview

  • Current status for Q3 goals
    • All: Set of tests for a main feature of Firefox 4
      • Can we make it an accomplished goal?
      • What takes lesser resources: Addons Manager vs. Panorama
    • Henrik: Dropping Mozmill Crowd extension?
    • Henrik: Web dashboard will be usable for the general test-run
    • Geo: Model for re-designing the shared modules
    • Adrian: DOM walker and set of l10n tests
  • Planning for Q4 (proposals)
    • Henrik: First public version of the Mozmill Crowd extension
    • Henrik: Dashboard for software updates and addons tests
    • Henrik: Continue preparation of tests to get run on buildbot (incl. local data and stablization)
    • Henrik: Continue creation of tests for Panorama (performance?)
    • Henrik: Refactoring the shared module system
    • Henrik: Enhancements to the on demand testing infrastructure

Projects

Mozmill (Henrik)
  • Buildbot integration with 10 tests will happen today or tomorrow
  • Common JS module for a more streamlined module inclusion will be available with Mozmill 1.5.1 (smooth transition for Mozmill 2.0)
Test creation / shared modules
  • General (Henrik)
    • Creation of a PoC for Panorama tests during the QA workweek + Demo
  • DOM Walker + L10n API (Adrian)
  • Redesign Shared Modules (Geo)
    • Got first "refactored" test working
Local Test Data (Anthony)
  • Likely to slip
  • 4 r?, 11 checkin-needed, 10 need patches
  • Won't have time to resolve all open issues and work on Panorama at the same time
Broken Tests
  • Firefox 4.0 (Geo)
  • Firefox 3.5/3.6 (Anthony)
    • No update
Update Tests (Henrik)
  • Fixed problem with missing fallback string in wiki results
  • Updated the SoftwareUpdateAPI for recent changes on trunk
  • bug 597664 gives us the chance to track slow mirrors
MozMill Crowd extension (Henrik)
  • No update
Add-ons Testing (Henrik)
  • Working with M.D.-Arche on Fidesfit client tests (bug 570493
Automation (Henrik)
  • No update
Dashboard (Henrik)
  • Staging server
  • Problems with filtering can be solved by using Ajax for view requests

Risky Goals

  • Mozmill Crowd extension

Personal

Henrik
  • Last two weeks
    • [DONE] Attended CouchCamp
    • [DONE] QA workweek - Creation of a PoC for Panorama + work on presentation
    • [MISSED] Finish work on the dashboard (general testrun)
    • Fixes for TabbedBrowsingAPI and SoftwareUpdateAPI
  • Next two weeks
    • Finish work on the dashboard (general testrun)
    • Depending on the goals we want to achieve this quarter:
      • Continue work on the crowd extension
      • Update AddonsAPI and prepare list of Mozmill tests to implement
Anthony
  • Last two weeks
    • [DONE] Patch review queue to 0
    • [DONE] Patch checkins to 0
  • Next two weeks
    • Review new patches to 0
    • Commit new check-ins to 0
    • Contribute 1 Panorama test
    • [AT RISK] QA results dashboard (if/when ready)
    • [AT RISK] QA crowd extension (if/when ready)
    • [AT RISK] Contribute 10 remaining local-data tests
Al
  • Last two weeks
    • Work on tab candy as possible during work week.
    • Finish carryover goals.
  • Next two weeks
    • Going to Bali.
Geo
Aaron
  • Last two weeks:
    • [CARRY OVER] of conversion of 31 tests to use local-data (patches and fixes upon reviews)
    • Attend QA work week
      • Presentation work w/Henrik & Geo
      • Panorama Challenge w/Henrik & Geo
      • local-data project work
  • Next two weeks:
    • Either divert focus to creating BFT focused Panorama tests with Anthony or carry on with local-data
Adrian
  • Last two weeks:
    • [DONE] (mostly) finish Documentation + UML Diagrams for CommonA11yL10nAPI (renamed to: DOMUtilitiesAPI) and L10nAPI
    • [DONE] (mostly) implementation of the CommonA11yL10nAPI (renamed to: DOMUtilitiesAPI) and L10nAPI: WIP patch attached to Bug 562084 - including two tests for the preferences window
  • Next two weeks:
    • implement the L10n tests for the update window
    • bring the 2 shared-modules and 4 tests through the reviews

Contributor Status

  • Name

Roundtable

General
Issues
  • Brasstacks
    • Issues with vhost/reversed proxy will remain for a while until VM's can be moved to Colo in Phoenix; AT team has to wait for Releng and prepare the move. Will be solved next quarter.
  • QA-Horus / QA-Set
    • Too less memory when running all VM's in parallel
    • Requested 32GB for both machines (bug 598305) - Matt has to approve

Action Items

  • [CARRY OVER] Geo: Send out list of broken tests w/ Fx4 and MM1.5