Name
|
Done
|
Plan
|
Al
|
- Week W45 (11/03~11/07)
- Mozilla Certificate Test Suite
- new comer training
|
- Week W46 (11/10~11/14)
- Mozilla Certificate Test Suite
- Remove unnecessary test environment from moztrap
- Africacom support (Monday and Tuesday)
|
Alison
|
- Week W45 (11/3~11/7):
- Bugs verification
- Go through NFC secure element API (2.2 feature) test spec with DT developer
- Try run marionette test for real device
|
|
Askeing
|
- Week W45 (11/3~11/7):
- Connected Devices meeting.
- Follow up the issues of Connected Devices.
- Develop cross-platform tools by Python.
|
|
Cynthia
|
- Week W45 (11/3~11/7):
- Marionette JS automation script for Email-Signature
- In setting, default signature is "Sent Using Firefox OS"
- In account setting, edit signature
- Set signature in new account page
- Original signature cannot be changed when user modified signature in mail body
- Africacom support: Assist Al in testing on Open C
- Take care of Flame KK v2.0 automation reports (Daily)
- Executing Gaia UI test on Woodduck and update reports on wiki (Daily)
- Test/verify bugs for Woodduck
|
- Week W46 (11/10~11/14)
- Create test cases for email forwarding attachments (v2.2)
- Take care of Flame KK v2.0 automation reports (Daily)
- Executing Gaia UI test on Woodduck and update reports on wiki (Daily)
- Test/verify bugs for Woodduck
|
|
Edward
|
- Week W45 (11/3~11/7):
- Verify sprint 7 and 8 tickets of productivity
- Create test cases (user flow) for power consumption.
- QAwanted bug verification and figure out issue.
|
|
Eric
|
- Week W45 (11/3~11/7):
- API testing checking
- Market customization testing
- Bugs testing with local patch
|
- Week W46 (11/10~11/14):
- API testing checking
- Moztrap cleanup plan
|
Gerry
|
- Week W45 (11/3~11/7):
- Finish test cases categorization for "System Platform"
- Follow up and verify bugs reported by QAnalyst.
|
|
Hubert
|
- Week W45 (11/03~11/07):
- Follow up Woodduck tasks and issues
- Handle outsource tasks
- Review issues filed by Marigold
- Woodduck triage meeting
- Outsourcing weekly meeting
- Generate power consumption test cases
- Survey power consumption test
|
|
Mike
|
- Week W45 (11/3~11/7):
- Flame FOTA verificaton
- Discuss power consumption benchmark
|
|
Paul
|
- Modify lab script by python
- Merge debug setting tools
-- backlog --
- Evaluating test solution on mac mini
- Followup live test run stream
- Datazilla integration
- Modifying crash report patch based on review
- Chaos Monkey for b2g (random process killer)
- Memory stress test
|
|
Shing
|
- Week W44 (11/3~11/7):
- MozTrap enhancement plan
- Studied Django
- MozTrap Performance Investigation
- Studied App with persistence
- Verify Marigold bugs
|
- Week W45 (11/10~11/14):
- Verify Bugs
- Finish cost control automation
- MozTrap Enhancements: plan addon features
- Django study group
- Backlog:
- Practice App with persistence.
|
Teri
|
- Week W44 (11/3~11/7):
- Verify Marigold test reports.
- Learn to write/run FxOS app.
- Learn about productivity apps.
|
|
Walter
|
- Week W45 (11/3~11/7):
- Taking care of Bugs
- Bug 1077292 - [MTBF][B2G] Phone shutdown due to high power consumption and chopped charging
- Bug 1092924 - [MTBF][B2G] B2G crashed due to oom or other related issues.
- Restruct
|
|
William Hsu
|
- Week W45 (11/03~11/07)
- [Device] Assist Tako related stuffs
- Assign Tako's bugs to developers and stakeholders.
- Weekly meeting with partner (11/04, TBC)
- [Device] Assist Flame related stuffs
- Gaia UI test on v2.0 Build
- v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn)
- Address camera failed tests
- test_sms_with_attachments.py
- test_camera_flash_modes.py
- Others,
- Health examination: Nov. 3rd (Morning).
- Personal leave: 11/06~11/10.
|
|