Name
|
Done
|
Plan
|
Al
|
- Week W47 (11/17~11/21)
- Three days off and QA Team building for one day
- MCTS for Stringray project discuss
|
- Week W48 (11/24~11/28)
- MCTS for Stringray project implementation
- Planning and implementation
- Certificate Permission App
|
Alison
|
- Week W47 (11/17~11/21)
- Practice Marionette JS for API testing
- Prepare simple SE API test case for DT
|
- Week W48 (11/24~11/28)
- Verify bugs
- Trouble shooting for SE API testing issue by marionette JS (DT execute)
|
Askeing
|
- Week W47 (11/17~11/21):
- Follow up Woodduck build issue.
- Mozilla Certificate Test Suite
- Connected Devices meeting.
- Plan Gaia Build process with Gaia team.
- Android L Porting.
|
- Week W48 (11/24~11/28):
- Device Builds discussion.
- Plan Gaia Build process with Gaia team.
- Android L Porting.
- Follow up Woodduck build issue.
- Mozilla Certificate Test Suite discussion.
- Connected Devices meeting.
|
Cynthia
|
- Week W47 (11/17~11/21)
- Take care of Flame KK v2.0 automation reports (Daily)
- Test/verify bugs for Woodduck
- Power consumption planning / discussion
- Optimize Radio Use while in Sleep Mode (Bug 1098316)
- Disable GPS When not in use or in foreground (Bug 1093618)
- Enable WiFi Low Power Mode by default (Bug 1084156)
|
- Week W48 (11/24~11/28)
- Take care of Flame KK v2.1 automation reports (Daily)
- Test/verify bugs for Woodduck
- Generate test cases for Power consumption
- Optimize Radio Use while in Sleep Mode
- Disable GPS When not in use or in foreground
- Enable WiFi Low Power Mode by default
|
Edward
|
- Week W47 (11/17~11/21)
- Power consumption planning / discussion
- Prepare automation scrum for TPE
- Verify sprint 8/ 9 tickets of productivity
|
- Week W48 (11/24~11/28)
- Power consumption planning / testing sheet creation / create test case
- [2.2][SysP] Study 2.2 feature spec
- [2.2][Prod] Study 2.2 feature spec
|
Eric
|
- Week W47 (11/17~11/21):
- Code coverage testing checking with RD
- V2.2 Prep
|
|
Gerry
|
- Week W47 (11/17~11/21):
- Follow up and verify bugs reported by QAnalyst
- Start to look at fxosqa-auto-backlog
- V2.2 Prep
|
- Week W48 (11/24~11/28)
- Follow up and verify bugs reported by QAnalyst
- [2.2] Study 2.2 feature spec - keyboard
- [2.2] Study 2.2 feature spec - wifi
|
Hubert
|
- Week W47 (11/17~11/21):
- Follow up Woodduck tasks and issues
- Handle outsource tasks
- Review issues filed by Marigold
- Woodduck triage meeting
- Outsourcing weekly meeting
|
- Week W47 (11/24~11/28):
- Follow up Woodduck tasks and issues
- Handle outsource tasks
- Review issues filed by Marigold
- Woodduck triage meeting
- Outsourcing weekly meeting
- Audit issue quality filed by Marigold
- Create OTA test document for Marigold.
|
Mike
|
- Week W47 (11/17~11/21)
- Power consumption task:
- Test method discussion
- Test case creation
- Compare automation tool with Orangutan
- Power tool sharing
- Branch management discussion
- EWC Handover
|
- Week W48 (11/24~11/28)
- Power consumption: Version comparison
- Follow up v2.1 bugs
|
Paul
|
- mtbf_operation script refactor
- Investigation for process killer poc
|
- Prepare Portland ww sessions
-- backlog --
- Modifying crash report patch based on review (pending to b2gDevice in mozbase)
- Followup live test run stream
- Datazilla integration
- Chaos Monkey for b2g (random process killer)
- Memory stress test
|
Shing
|
- Week W47 (11/17~11/21)
- [MozTrap] Improve frontend JS performance
- Study ScreenSharingAPI and SyncAPI
- --backlog--
- [MozTrap] Uplift JS performance fix to master branch
|
- Week W48 (11/24~11/28)
- [MozTrap] Submit JS modifications to upstream
- [2.2] Study 2.2 feature spec
- [2.2] Study 2.2 new API (ScreenSharing and Sync)
- [MozTrap] Study MozTrap RESTful API
|
Teri
|
- Week W47 (11/17~11/21)
- Prepare for V2.2 productivity
- Practice Marionette JS test cases
- Practice write/run FxOS app.
- Learn about node.js.
|
- Week W48 (11/24~11/28)
- [2.2] Study Productivity: calendar and email feature spec
- Test run apps to get familiar
- Study MozTrap test cases
- Study RTL specs (including clock)
- Learn about pairwise testing
|
Walter
|
- Week W47 (11/17~11/21):
- Taking care of Bugs
- Bug 1077292 - [MTBF][B2G] Phone shutdown due to high power consumption and chopped charging
- Bug 1092924 - [MTBF][B2G] B2G crashed due to oom or other related issues.
- Help T2M with setting up environment
- Bug 1081577 - [Performance][Dialer] lmk.js is wrong in Flame base image
- lmk.js experiments (some more issues)
- Bug 1094070 - [MTBF][B2G][Camera][Media Server] black camera screen with buttons
- Reproduced in v180 v184 v188 and log provided.
- Restruct
- Combo Runner restruct done
- MTBF restruct in process
|
|
William Hsu
|
- Week W47 (11/17~11/21)
- [Device] Assist Tako related stuffs
- Assign Tako unsolved bugs to developers and stakeholders.
- Coach Marigold for flashing Tako device.
- Weekly meeting with partners
- [Device] Assist Flame related stuffs
- Gaia UI test on v2.0 Build
- Create jobs (Jenkins) for v2.1 Branch - Automation tests
- Gaia UI test on v2.1 Build
- v2.0 Bug verification (verifyme)
- Others,
|
- Week W48 (11/24~11/28)
- [Device] Assist Dolphin related stuffs
- Performance evaluation (Smoketest, test-perf, and Gaia UI test)
- FPS measurement
- [Device] Assist Tako related stuffs
- Follow remaining tasks, and close Tako's bug (v2.1 & v2.0)
- [Device] Assist Flame related stuffs
- Gaia UI test on v2.0 Build
- Gaia UI test on v2.1 Build
- Tune GU's testvars (Flame v2.1)
- v2.0 Bug verification (verifyme)
|
Hermes cheng
|
- Week W47 (11/17~11/21)
- Study automated testing
- [2.2] keep studying assigned V2.2 features
- Study 1098385 specs (OS update), clarify questions with PM, UX team on bugzilla
|
- Week W48 (11/24~11/28)
- [2.2] keep studying assigned V2.2 features
- Start to design test cases for 1098385 (OS update)
- Study 1098393 (Task Manager) and clarify questions
- No spec for 1098376 (flashlight) now, holding
- [MozTrap] find out unfriendly interaction
|